A Beautiful Fall Weekend at the Boatyard

BetsySteel Boat

A week in the life of SV Seeker. We get a look at a high tech robot for measuring rail roads, install some foam board insulation, cedar planking, furring strips. Of course a little plasma cutting, welding, and yes, grinding Their website, https://www.jerrysmajestic.com has all of the details. The dragons are getting new paint. Installed the engine room storage drawers. Figure out the Center of Gravity and axle loads. And get Lorenzo’s plasma machine fixed by David at Red-D-Arc. We sadly we lost a friend and crew member we loved, so this video is dedicated to Huge Hood.