Aaron Buscavage flew in from Baker Florida and is doing an outstanding job knocking out the final welding on the cabin tops. At this rate we will be welding the deck to the side of the hull by Sunday. But we have to figure out where the port holes and freeing ports go first and cut the latter out. Jack gets points today for wiring 8 outlets onto the end of our 220 extension. How needs an earth ground? Not us. We figure the boat is ground enough. 🙂 And Jack gets double bonus points for bringing a car creeper that lets Aaron roll along as he does the overhead welds on the cabin.