A Week in the SV Seeker Boatyard

BetsySteel Boat

Port of Catoosa Launch Party Tickets on Sale Now! http://www.seachestfoundation.org/cat…

Thanks to Brandon, Evan, Devin, Justin and Peter. We got a lot of cleanup, and touch ups done, along with some hydraulic work, make some fenders, tested the new outboard, and made a new CNC table from the old CNC table. All and all, a very productive and fun week. And we are now 40 days from our move to the Tulsa Port of Catoosa.

Pilothouse Fitout – Part 9 – Epoxy Table Top and more

BetsySteel Boat

We connected push pull cables in the engine room. Mounted fixtures in the pilothouse. And finished a beautiful pilothouse table to go with the worlds most awesome ships wheel. Thanks to Steven Rangel from Boston, Patrick “OK Diver” and TotalBoat for the Table Top Epoxy and Varnish.

TotalBoat Table Top Epoxy: https://amzn.to/34bg0qC
TotalBoat Halcyon Marine Varnish: https://amzn.to/3fAgfAG
Foam Brushes: https://amzn.to/3fxYYIc
Sanding Discs 8 Holes 240/600/1500/2000 Grit: https://amzn.to/2TdKXYX